BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Regenerator Column

Assembly

Heated stripping still where a steam reboiler drives H2S and CO2 out of the rich amine; the stripped lean amine returns to the absorber. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Regenerator Column parts and their functions

6 top-level parts · 1,136 parts in total · full bill of materials below
Regenerator Column parts diagram: 1 still shell, 2 valve tray, 3 steam reboiler, 4 still internals support, 5 manway, 6 process nozzle. 1,136 parts in 6 top-level items.
Regenerator Column parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Still Shell 1×
2 Valve Tray 3 parts 18× Contacting tray with liftable valve caps that bubble gas through the amine.
3 Steam Reboiler 4 parts 1× Kettle reboiler supplying the heat that strips acid gas from the amine.
4 Still Internals Support 1×
5 Manway 3×
6 Process Nozzle 10×

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Regenerator Column

6 top-level lines · 13 rows shown · 1,136 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Still Shell atu-still-shell 1× 1 · part
2 Valve Tray 3 parts atu-tray 18× 18 62 assembly
2.1 Tray Deck atu-tray-deck 1× 18 · part
2.2 Tray Valve Cap atu-tray-valve 60× 1,080 · part
2.3 Downcomer atu-downcomer 1× 18 · part
3 Steam Reboiler 4 parts atu-reboiler 1× 1 5 assembly
3.1 Reboiler Shell atu-reboiler-shell 1× 1 · part
3.2 Tube Bundle atu-tube-bundle 1× 1 · part
3.3 Steam Trap atu-steam-trap 2× 2 · part
3.4 Heating Element heating-element 1× 1 · part
4 Still Internals Support atu-still-internals 1× 1 · part
5 Manway atu-manway 3× 3 · part
6 Process Nozzle atu-nozzle 10× 10 · part

Where the regenerator column is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2–$500. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Inovance
inovance.com ↗
Shenzhen, CN Drives & motion control 500 units 10–14 wks
🇮🇳Sona Comstar
sonacomstar.com ↗
Gurugram, IN EV driveline & motors 500 units 10–14 wks
🇨🇳Broad-Ocean
broad-ocean.com ↗
Zhongshan, CN Electric motors 500 units 10–14 wks
nidec.com ↗ Singapore Motors, regional ops 500 units 10–14 wks
🇮🇳Bosch India
bosch.in ↗
Bengaluru, IN Automotive components 500 units 10–14 wks