BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Fluid End

Assembly

The wet end where three plungers draw CO2 in through suction valves and push it out through discharge valves; on a triplex pump this section sees the full discharge pressure and does all the pumping work. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fluid End parts and their functions

13 top-level parts · 42 parts in total · full bill of materials below
Fluid End parts diagram: 1 fluid-end cylinder block, 2 plunger, 3 plunger packing set, 4 stuffing box, 5 suction valve, 6 discharge valve, 7 valve seat, 8 valve spring, 9 valve cover, 10 suction manifold, 11 discharge manifold, 12 o-ring set, 13 fastener set. 42 parts in 13 top-level items.
Fluid End parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Fluid-End Cylinder Block 1× Fluid-end cylinder block
2 Plunger 3× Plungers
3 Plunger Packing Set 3× Plunger packing sets
4 Stuffing Box 1 parts 3× Stuffing boxes
5 Suction Valve 3× Suction valves
6 Discharge Valve 3× Discharge valves
7 Valve Seat 6× Valve seats
8 Valve Spring 6× Valve springs
9 Valve Cover 6× Valve covers
10 Suction Manifold 1× Suction manifold
11 Discharge Manifold 1× Discharge manifold
12 O-Ring Set 4× Manifold and cover seals
13 Fastener Set 2× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fluid End

13 top-level lines · 14 rows shown · 42 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Fluid-End Cylinder Block co2-injection-pump-fluid-cylinder 1× 1 · part
2 Plunger co2-injection-pump-plunger 3× 3 · part
3 Plunger Packing Set co2-injection-pump-packing-set 3× 3 · part
4 Stuffing Box 1 parts co2-injection-pump-stuffing-box 3× 3 · part
4.1 Lantern Ring co2-injection-pump-lantern-ring 1× 3 · part
5 Suction Valve co2-injection-pump-suction-valve 3× 3 · part
6 Discharge Valve co2-injection-pump-discharge-valve 3× 3 · part
7 Valve Seat co2-injection-pump-valve-seat 6× 6 · part
8 Valve Spring co2-injection-pump-valve-spring 6× 6 · part
9 Valve Cover co2-injection-pump-valve-cover 6× 6 · part
10 Suction Manifold co2-injection-pump-suction-manifold 1× 1 · part
11 Discharge Manifold co2-injection-pump-discharge-manifold 1× 1 · part
12 O-Ring Set oring-set 4× 4 · part
13 Fastener Set fastener-set 2× 2 · part

Where the fluid end is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks