Bottom Head and Discharge System
AssemblyAutomated bottom unheading device and chute that drop cut coke into the pit below. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bottom Head and Discharge System parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bottom Unheading Device | 1× | Automated bottom head closure |
| 2 | Discharge Chute | 1× | Coke chute to the pit |
| 3 | Bottom Head Actuator | 1× | Hydraulic actuator for bottom head |
| 4 | Bottom Isolation Valve | 1× | Bottom isolation valve |
| 5 | Unheading Seal | 1× | High-pressure unheading seal |
| 6 | Fastener Set | 1× | Bolting kit |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Bottom Head and Discharge System
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bottom Unheading Device | coker-bottom-unheading-valve | 1× | 1 | · | part |
| 2 | Discharge Chute | coker-discharge-chute | 1× | 1 | · | part |
| 3 | Bottom Head Actuator | coker-bottom-actuator | 1× | 1 | · | part |
| 4 | Bottom Isolation Valve | coker-bottom-isolation-valve | 1× | 1 | · | part |
| 5 | Unheading Seal | coker-deheading-seal | 1× | 1 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Where the bottom head and discharge system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |