Top Head and Overhead System
AssemblyAutomated top unheading device and the overhead line carrying cracked vapor to the coker fractionator. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Top Head and Overhead System parts and their functions
6 top-level parts · 10 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Top Unheading Device | 1× | Automated top head closure |
| 2 | Overhead Transfer Line | 1× | Transfer line to fractionator |
| 3 | Overhead Quench Ring | 1× | Overhead vapor quench injection |
| 4 | Overhead Isolation Valve | 2× | Overhead isolation valves |
| 5 | Top Head Actuator | 1× | Hydraulic actuator for top head |
| 6 | O-Ring Set | 4× | High-temperature seal kit |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Top Head and Overhead System
6 top-level lines · 6 rows shown · 10 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Top Unheading Device | coker-top-unheading-valve | 1× | 1 | · | part |
| 2 | Overhead Transfer Line | coker-overhead-line | 1× | 1 | · | part |
| 3 | Overhead Quench Ring | coker-overhead-quench-ring | 1× | 1 | · | part |
| 4 | Overhead Isolation Valve | coker-spool-isolation-valve | 2× | 2 | · | part |
| 5 | Top Head Actuator | coker-top-head-actuator | 1× | 1 | · | part |
| 6 | O-Ring Set | oring-set | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the top head and overhead system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |