Top Sub Connection
AssemblyThreaded sub at the upper end of the packer that connects the tool to the production tubing and transfers setting load from the running string. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Top Sub Connection
4 top-level lines as of r49296| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Top Sub Body | dhp-top-sub-body | 1× | 1 | · | part |
| 2 | Tubing Thread Profile | dhp-tubing-thread | 1× | 1 | · | part |
| 3 | Thread Protector Cap | dhp-top-thread-protector | 1× | 1 | · | part |
| 4 | O-Ring Set | oring-set | 1× | 1 | · | part |