Glycol Contactor
AssemblyHigh-pressure trayed or packed tower where wet gas rises against dry TEG; the glycol absorbs water vapor and dry gas leaves overhead. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Glycol Contactor parts and their functions
7 top-level parts · 222 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Contactor Shell | 1× | |
| 2 | Bubble-Cap Tray 3 parts | 8× | Contacting tray with bubble caps that hold a glycol level for the gas to bubble through. |
| 3 | Mist Eliminator | 1× | Vane pack catching glycol droplets in the dry gas. |
| 4 | Inlet Gas Distributor | 1× | |
| 5 | Glycol Chimney Tray | 1× | |
| 6 | Manway | 2× | |
| 7 | Process Nozzle | 8× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Glycol Contactor
7 top-level lines · 10 rows shown · 222 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Contactor Shell | gds-contactor-shell | 1× | 1 | · | part |
| 2 | Bubble-Cap Tray 3 parts | gds-bubble-tray | 8× | 8 | 26 | assembly |
| 2.1 | Tray Deck | gds-tray-deck | 1× | 8 | · | part |
| 2.2 | Bubble Cap | gds-bubble-cap | 24× | 192 | · | part |
| 2.3 | Downcomer | gds-downcomer | 1× | 8 | · | part |
| 3 | Mist Eliminator | gds-mist-eliminator | 1× | 1 | · | part |
| 4 | Inlet Gas Distributor | gds-gas-distributor | 1× | 1 | · | part |
| 5 | Glycol Chimney Tray | gds-chimney-tray | 1× | 1 | · | part |
| 6 | Manway | gds-manway | 2× | 2 | · | part |
| 7 | Process Nozzle | gds-nozzle | 8× | 8 | · | part |
Where the glycol contactor is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |