BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Logging Cabin

Assembly

The skid-mounted explosion-rated cabin that houses the analysts, instruments, and air conditioning at the rig. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Logging Cabin parts and their functions

6 top-level parts · 12 parts in total · full bill of materials below
Logging Cabin parts diagram: 1 cabin shell, 2 transport skid, 3 cabin HVAC, 4 pressurization unit, 5 work desk, 6 sheet metal panel. 12 parts in 6 top-level items.
Logging Cabin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cabin Shell 1× Cabin shell
2 Transport Skid 1× Transport skid
3 Cabin HVAC 1× Cabin HVAC
4 Pressurization Unit 1× Positive pressurization
5 Work Desk 2× Work desks
6 Sheet Metal Panel 6× Wall panels

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Logging Cabin

6 top-level lines · 6 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cabin Shell mud-logging-unit-cabin-shell 1× 1 · part
2 Transport Skid mud-logging-unit-skid 1× 1 · part
3 Cabin HVAC mud-logging-unit-hvac 1× 1 · part
4 Pressurization Unit mud-logging-unit-pressurization 1× 1 · part
5 Work Desk mud-logging-unit-desk 2× 2 · part
6 Sheet Metal Panel sheet-panel 6× 6 · part

Where the logging cabin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks