BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Cuttings Analysis

Assembly

The bench, microscope, and tests the mud logger uses to describe the rock fragments coming up the hole. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cuttings Analysis parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Cuttings Analysis parts diagram: 1 wash bench, 2 binocular microscope, 3 UV fluorescence box, 4 calcimeter, 5 wet sieve shaker, 6 drying oven. 6 parts in 6 top-level items.
Cuttings Analysis parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Wash Bench 1× Wash bench
2 Binocular Microscope 1× Binocular microscope
3 UV Fluorescence Box 1× UV fluorescence box
4 Calcimeter 1× Calcimeter
5 Wet Sieve Shaker 1× Wet sieve shaker
6 Drying Oven 1× Drying oven

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cuttings Analysis

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Wash Bench mud-logging-unit-sample-bench 1× 1 · part
2 Binocular Microscope mud-logging-unit-microscope 1× 1 · part
3 UV Fluorescence Box mud-logging-unit-uv-box 1× 1 · part
4 Calcimeter mud-logging-unit-calcimeter 1× 1 · part
5 Wet Sieve Shaker mud-logging-unit-sample-shaker 1× 1 · part
6 Drying Oven mud-logging-unit-drying-oven 1× 1 · part

Where the cuttings analysis is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks