BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Running and Retrieving Tools

Assembly

Drill-pipe deployed tools that run, land, set and later retrieve the hangers and seals. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Running and Retrieving Tools parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Running and Retrieving Tools parts diagram: 1 running tool body, 2 collet, 3 j-slot mechanism, 4 retrieving tool, 5 seal test tool, 6 orientation sub. 6 parts in 6 top-level items.
Running and Retrieving Tools parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Running Tool Body 1× Main running tool body run on drill pipe
2 Collet 1× Collet engaging the hanger mandrel profile
3 J-Slot Mechanism 1× J-slot mechanism setting and releasing the tool
4 Retrieving Tool 1× Retrieving tool for pulling the hanger or wear bushing
5 Seal Test Tool 1× Seal test tool pressuring the annulus after setting
6 Orientation Sub 1× Orientation sub timing the tool to the alignment keys

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Running and Retrieving Tools

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Running Tool Body mudline-suspension-system-running-tool-body 1× 1 · part
2 Collet mudline-suspension-system-collet 1× 1 · part
3 J-Slot Mechanism mudline-suspension-system-j-slot 1× 1 · part
4 Retrieving Tool mudline-suspension-system-retrieving-tool 1× 1 · part
5 Seal Test Tool mudline-suspension-system-test-tool 1× 1 · part
6 Orientation Sub mudline-suspension-system-orientation-sub 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the running and retrieving tools is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks