BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Wear and Isolation

Assembly

Wear bushing and isolation sleeve protecting the landed seal bores during drilling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wear and Isolation parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Wear and Isolation parts diagram: 1 wear bushing, 2 isolation sleeve, 3 bushing retainer, 4 bore protector. 4 parts in 4 top-level items.
Wear and Isolation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Wear Bushing 1× Wear bushing protecting the bore from drill string contact
2 Isolation Sleeve 1× Isolation sleeve covering the seal bores during drilling
3 Bushing Retainer 1× Retainer locking the wear bushing in place
4 Bore Protector 1× Bore protector run during conductor installation

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wear and Isolation

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Wear Bushing mudline-suspension-system-wear-bushing 1× 1 · part
2 Isolation Sleeve mudline-suspension-system-isolation-sleeve 1× 1 · part
3 Bushing Retainer mudline-suspension-system-bushing-retainer 1× 1 · part
4 Bore Protector mudline-suspension-system-nominal-bore-protector 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the wear and isolation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks