BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Feed Gas Treatment

Assembly

Removes water and CO2 so they cannot freeze in the cryogenic section. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Feed Gas Treatment parts and their functions

6 top-level parts · 11 parts in total · full bill of materials below
Feed Gas Treatment parts diagram: 1 inlet separator, 2 amine contactor, 3 molecular sieve bed, 4 dust filter, 5 mercury removal bed, 6 pressure sensor. 11 parts in 6 top-level items.
Feed Gas Treatment parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Inlet Separator 1× Slug catcher and inlet separator removing free liquids
2 Amine Contactor 1× Amine absorber stripping CO2 from the feed
3 Molecular Sieve Bed 2× Molecular sieve dehydration vessels, lead and lag
4 Dust Filter 2× Particulate filters protecting the sieve and cold box
5 Mercury Removal Bed 1× Mercury removal bed protecting aluminum exchangers
6 Pressure Sensor 4× Pressure transmitters across the treatment trains

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Feed Gas Treatment

6 top-level lines · 6 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Inlet Separator nitrogen-rejection-unit-inlet-separator 1× 1 · part
2 Amine Contactor nitrogen-rejection-unit-amine-contactor 1× 1 · part
3 Molecular Sieve Bed nitrogen-rejection-unit-mol-sieve-bed 2× 2 · part
4 Dust Filter nitrogen-rejection-unit-dust-filter 2× 2 · part
5 Mercury Removal Bed nitrogen-rejection-unit-mercury-bed 1× 1 · part
6 Pressure Sensor pressure-sensor 4× 4 · part

Where the feed gas treatment is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks