BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Utilities and Flare

Assembly

Instrument air, dry nitrogen purge, relief, and flare connections for the unit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Utilities and Flare parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Utilities and Flare parts diagram: 1 instrument air package, 2 nitrogen purge skid, 3 pressure relief valve, 4 flare knockout drum, 5 cold vent stack. 8 parts in 5 top-level items.
Utilities and Flare parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Instrument Air Package 1× Instrument air dryer and receiver
2 Nitrogen Purge Skid 1× Dry nitrogen purge and blanketing skid
3 Pressure Relief Valve 4× Pressure relief valves on vessels and exchangers
4 Flare Knockout Drum 1× Flare knockout drum on the relief header
5 Cold Vent Stack 1× Cold vent stack dispersing nitrogen reject

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Utilities and Flare

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Instrument Air Package nitrogen-rejection-unit-instrument-air 1× 1 · part
2 Nitrogen Purge Skid nitrogen-rejection-unit-purge-skid 1× 1 · part
3 Pressure Relief Valve nitrogen-rejection-unit-relief-valve 4× 4 · part
4 Flare Knockout Drum nitrogen-rejection-unit-flare-ko-drum 1× 1 · part
5 Cold Vent Stack nitrogen-rejection-unit-vent-stack 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the utilities and flare is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks