Secondary Containment
AssemblyStainless drip pan and bunded base that capture any odorant leakage, with point leak detection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Secondary Containment parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Drip Pan | 1× | Welded 316 SS pan under tank and pumps |
| 2 | Bund Wall | 1× | Raised containment curb sized for tank volume |
| 3 | Containment Sump | 1× | Low-point sump collecting spills |
| 4 | Leak Sensor | 1× | Liquid leak detector in the sump |
| 5 | Containment Drain Valve | 1× | Manual drain to a recovery drum |
| 6 | Spill Grating | 1× | Removable walk grating over the pan |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Secondary Containment
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Drip Pan | odorizer-skid-drip-pan | 1× | 1 | · | part |
| 2 | Bund Wall | odorizer-skid-bund-wall | 1× | 1 | · | part |
| 3 | Containment Sump | odorizer-skid-sump | 1× | 1 | · | part |
| 4 | Leak Sensor | odorizer-skid-leak-sensor | 1× | 1 | · | part |
| 5 | Containment Drain Valve | odorizer-skid-containment-drain-valve | 1× | 1 | · | part |
| 6 | Spill Grating | odorizer-skid-spill-grating | 1× | 1 | · | part |
Where the secondary containment is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |