BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Supports & Handling

Assembly

Civil and mechanical hardware carrying the barrel and assisting heavy pig handling. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Supports & Handling parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Supports & Handling parts diagram: 1 saddle support, 2 pig loading tray, 3 earthing boss, 4 fastener set. 7 parts in 4 top-level items.
Supports & Handling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Saddle Support 2× Fixed and sliding saddles
2 Pig Loading Tray 1× Roller tray for tool insertion
3 Earthing Boss 2× Static bonding points
4 Fastener Set 2× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Supports & Handling

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Saddle Support pipeline-pig-launcher-saddle-support 2× 2 · part
2 Pig Loading Tray pipeline-pig-launcher-pig-loading-tray 1× 1 · part
3 Earthing Boss pipeline-pig-launcher-earthing-boss 2× 2 · part
4 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the supports & handling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks