BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Lubricator and Catcher Assembly

Assembly

Surface housing mounted above the master valve that receives the arriving plunger, catches and holds it for fall control, and routes produced fluid to the flowline. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lubricator and Catcher Assembly parts and their functions

7 top-level parts · 8 parts in total · full bill of materials below
Lubricator and Catcher Assembly parts diagram: 1 lubricator body, 2 plunger catcher mechanism, 3 arrival sensor, 4 top cap, 5 striker pad, 6 o-ring set, 7 fastener set. 8 parts in 7 top-level items.
Lubricator and Catcher Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lubricator Body 1× Pressure housing above wellhead
2 Plunger Catcher Mechanism 1× Catch mechanism that holds plunger
3 Arrival Sensor 1× Detects plunger arrival
4 Top Cap 1× Removable top closure
5 Striker Pad 1× Cushion the plunger impact at top
6 O-Ring Set 2× Body and cap seals
7 Fastener Set 1× Cap and flange bolts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lubricator and Catcher Assembly

7 top-level lines · 7 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lubricator Body pls-lubricator-body 1× 1 · part
2 Plunger Catcher Mechanism pls-plunger-catcher 1× 1 · part
3 Arrival Sensor pls-arrival-sensor 1× 1 · part
4 Top Cap pls-top-cap 1× 1 · part
5 Striker Pad pls-striker-pad 1× 1 · part
6 O-Ring Set oring-set 2× 2 · part
7 Fastener Set fastener-set 1× 1 · part

Where the lubricator and catcher assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks