Tubing Hanger
AssemblyConcentric or multi-bore hanger that supports the tubing string and aligns production and annulus bores. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Tubing Hanger
4 top-level lines as of r166606| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Hanger Body Forging | subsea-production-tree-hanger-body | 1× | 1 | · | part |
| 2 | Downhole Penetrator | subsea-production-tree-downhole-penetrator | 2× | 2 | · | part |
| 3 | Orientation Helix and Pin | subsea-production-tree-orientation-pin | 1× | 1 | · | part |
| 4 | O-Ring Set | oring-set | 3× | 3 | · | part |