BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Waste Heat Boiler

Assembly

Fire-tube boiler cooling furnace effluent from about 1250 C to 320 C while raising medium-pressure steam. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Waste Heat Boiler parts and their functions

7 top-level parts · 10 parts in total · full bill of materials below
Waste Heat Boiler parts diagram: 1 boiler shell, 2 boiler tube bundle, 3 boiler tube sheet, 4 ceramic ferrule set, 5 steam drum internals, 6 steam safety valve, 7 pressure sensor. 10 parts in 7 top-level items.
Waste Heat Boiler parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Boiler Shell 1× Steam drum and water-side pressure shell
2 Boiler Tube Bundle 1× Fire-tube bundle carrying process gas
3 Boiler Tube Sheet 2× Tube sheets with ferrule protection at the hot face
4 Ceramic Ferrule Set 1× Ceramic ferrules shielding the inlet tube ends
5 Steam Drum Internals 1× Cyclone separators and feedwater distributor
6 Steam Safety Valve 2× Spring-loaded steam relief valves
7 Pressure Sensor 2× Steam pressure and process gas pressure transmitters

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Waste Heat Boiler

7 top-level lines · 7 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Boiler Shell sulfur-recovery-unit-whb-shell 1× 1 · part
2 Boiler Tube Bundle sulfur-recovery-unit-whb-tube-bundle 1× 1 · part
3 Boiler Tube Sheet sulfur-recovery-unit-whb-tube-sheet 2× 2 · part
4 Ceramic Ferrule Set sulfur-recovery-unit-ferrule-set 1× 1 · part
5 Steam Drum Internals sulfur-recovery-unit-steam-drum-internals 1× 1 · part
6 Steam Safety Valve sulfur-recovery-unit-safety-valve 2× 2 · part
7 Pressure Sensor pressure-sensor 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the waste heat boiler is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks