Skid and Piping

Assembly

Structural skid base, interconnecting piping and supports. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Skid and Piping parts and their functions

5 top-level parts · 20 parts in total · full bill of materials below
Skid and Piping parts diagram: 1 skid frame, 2 pipe spool, 3 pipe support, 4 walkway and ladder, 5 earthing boss. 20 parts in 5 top-level items.
Skid and Piping parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Skid Frame 1× Welded structural steel skid base
2 Pipe Spool 6× Inlet and outlet flanged pipe spools
3 Pipe Support 8× Pipe clamps and stanchion supports
4 Walkway and Ladder 1× Grating walkway and access ladder
5 Earthing Boss 4× Earthing bosses for bonding

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Skid and Piping

5 top-level lines · 5 rows shown · 20 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Skid Frame three-phase-separator-skid-frame 1× 1 · part
2 Pipe Spool three-phase-separator-pipe-spool 6× 6 · part
3 Pipe Support three-phase-separator-pipe-support 8× 8 · part
4 Walkway and Ladder three-phase-separator-walkway 1× 1 · part
5 Earthing Boss three-phase-separator-earth-boss 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the skid and piping is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks