BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Burner Management System

Assembly

Safety-rated controller that sequences purge, ignition, vapor admission, and shutdown, and trips the unit on any unsafe state. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Burner Management System parts and their functions

6 top-level parts · 143 parts in total · full bill of materials below
Burner Management System parts diagram: 1 BMS controller, 2 control panel, 3 operator touchscreen, 4 emergency stop button, 5 relay, 6 wire bundle. 143 parts in 6 top-level items.
Burner Management System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 BMS Controller 4 parts 1× Safety burner management controller
2 Control Panel 4 parts 1× Purged control enclosure
3 Operator Touchscreen 1× Operator touchscreen
4 Emergency Stop Button 2× Emergency shutdown pushbuttons
5 Relay 6× Safety interposing relays
6 Wire Bundle 1× Field instrument and valve wiring

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Burner Management System

6 top-level lines · 14 rows shown · 143 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 BMS Controller 4 parts vapor-combustion-unit-bms-controller 1× 1 124 assembly
1.1 Bare PCB pcb-bare 1× 1 · part
1.2 Microcontroller mcu 2× 2 · part
1.3 SMD Passive (R/C/L) smd-passives 120× 120 · part
1.4 Power Supply power-supply 1× 1 · part
2 Control Panel 4 parts vapor-combustion-unit-control-panel 1× 1 9 assembly
2.1 I/O Module vapor-combustion-unit-io-module 3× 3 · part
2.2 Purge Unit vapor-combustion-unit-purge-unit 1× 1 · part
2.3 Power Supply power-supply 1× 1 · part
2.4 Relay relay 4× 4 · part
3 Operator Touchscreen vapor-combustion-unit-hmi 1× 1 · part
4 Emergency Stop Button vapor-combustion-unit-esd-button 2× 2 · part
5 Relay relay 6× 6 · part
6 Wire Bundle wire-bundle 1× 1 · part

Where the burner management system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks