BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Hydraulic System

Assembly

The pumps, valves, and tank that power rotation, feed, outriggers, and winches. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hydraulic System parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Hydraulic System parts diagram: 1 hydraulic pump, 2 valve bank, 3 hydraulic tank, 4 oil cooler, 5 filter. 7 parts in 5 top-level items.
Hydraulic System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hydraulic Pump 2× Hydraulic pumps
2 Valve Bank 1× Valve bank
3 Hydraulic Tank 1× Hydraulic tank
4 Oil Cooler 1× Oil cooler
5 Filter 2× Filters

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hydraulic System

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hydraulic Pump water-well-drilling-rig-main-pump 2× 2 · part
2 Valve Bank water-well-drilling-rig-valve-bank 1× 1 · part
3 Hydraulic Tank water-well-drilling-rig-oil-tank 1× 1 · part
4 Oil Cooler water-well-drilling-rig-oil-cooler 1× 1 · part
5 Filter water-well-drilling-rig-filter 2× 2 · part

Where the hydraulic system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks