BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Interior

Assembly

Mostly standing-room cabin with perimeter perch seats and a dense grab-rail grid. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Interior parts and their functions

5 top-level parts · 47 parts in total · full bill of materials below
Interior parts diagram: 1 perch seat, 2 grab rail, 3 vertical stanchion, 4 floor trim & skirts, 5 ceiling panel. 47 parts in 5 top-level items.
Interior parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQty
1 Perch Seat 12×
2 Grab Rail 16×
3 Vertical Stanchion 10×
4 Floor Trim & Skirts 1×
5 Ceiling Panel 8×

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Interior

5 top-level lines · 5 rows shown · 47 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Perch Seat airport-shuttle-bus-perch-seat 12× 12 · part
2 Grab Rail airport-shuttle-bus-grab-rail 16× 16 · part
3 Vertical Stanchion airport-shuttle-bus-stanchion 10× 10 · part
4 Floor Trim & Skirts airport-shuttle-bus-flooring-trim 1× 1 · part
5 Ceiling Panel airport-shuttle-bus-ceiling-panel 8× 8 · part

Where the interior is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks