BOMwiki the bill-of-materials encyclopedia

Railway Turntable Product

A rotating bridge platform supporting a railway locomotive or coach on a circular rail, driven by electric motors for directional positioning. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials

7 top-level lines · 42 rows shown · 130 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Circular Rail Track 3 parts railway-turntable-circular-rail 1 26 assembly
1.1 Curved Rail Segment railway-turntable-rail-segment 8 part
1.2 Rail Bracket railway-turntable-rail-bracket 16× 16 part
1.3 Fastener Set fastener-set 2 part
2 Rotating Bridge Deck 4 parts railway-turntable-bridge-deck 1 11 assembly
2.1 Deck Main Beam railway-turntable-deck-beams 2 part
2.2 Cross Member railway-turntable-cross-members 6 part
2.3 Deck Plate railway-turntable-deck-plate 1 part
2.4 Sheet Metal Panel sheet-panel 2 part
3 Center Pivot Bearing 4 parts railway-turntable-center-pivot 1 5 assembly
3.1 Pivot Base Pedestal railway-turntable-pivot-base 1 part
3.2 Ball Bearing ball-bearing 2 part
3.3 Lubricant Housing railway-turntable-lubricant-housing 1 part
3.4 O-Ring Set oring-set 1 part
4 Drive Units 4 parts railway-turntable-drive-units 1 64 assembly
4.1 Drive Motor 4 parts railway-turntable-drive-motor 2 25 assembly
4.1.1 Stator Assembly 3 parts + deeper › stator-assembly 2 3 assembly
4.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 2 19 assembly
4.1.3 Ball Bearing ball-bearing 4 part
4.1.4 Oil Seal oil-seal 2 part
4.2 Gear Reducer 4 parts railway-turntable-gear-reducer 2 5 assembly
4.2.1 Gearbox Housing gearbox-housing 2 part
4.2.2 Helical Gear Pair gear-pair 2 part
4.2.3 Ball Bearing ball-bearing 4 part
4.2.4 Oil Seal oil-seal 2 part
4.3 Drive Wheel railway-turntable-drive-wheel 2 part
4.4 Wheel Bearing Block railway-turntable-wheel-bearing-block 2 part
5 Mechanical Lock 3 parts railway-turntable-locking-system 1 4 assembly
5.1 Lock Hook railway-turntable-lock-hook 1 part
5.2 Lock Actuator 2 parts railway-turntable-lock-actuator 1 2 assembly
5.2.1 Pressure Sensor pressure-sensor 1 part
5.2.2 Fastener Set fastener-set 1 part
5.3 Fastener Set fastener-set 1 part
6 Guide Wheel System 2 parts railway-turntable-guide-wheels 1 12 assembly
6.1 Guide Wheel railway-turntable-guide-wheel 4 part
6.2 Ball Bearing ball-bearing 8 part
7 Control Panel 5 parts railway-turntable-control-panel 1 8 assembly
7.1 Bare PCB pcb-bare 1 part
7.2 Microcontroller mcu 1 part
7.3 Encoder encoder 1 part
7.4 Relay relay 4 part
7.5 LCD Panel lcd-panel 1 part

Sourcing — likely vendors

Companies that make this · indicative price $500k–$60M · MOQ & lead are typical
VendorHQSpecialtyMOQLead time
🇨🇳CRRC
crrcgc.cc ↗
Beijing, CN Rolling stock & rail systems made to order 40–72 wks
🇫🇷Alstom
alstom.com ↗
Saint-Ouen, FR Rail rolling stock made to order 40–72 wks
mobility.siemens.com ↗ Munich, DE Rail systems made to order 40–72 wks
🇨🇭Stadler Rail
stadlerrail.com ↗
Bussnang, CH Rail rolling stock made to order 40–72 wks
🇺🇸Wabtec
wabteccorp.com ↗
Pittsburgh, US Rail equipment made to order 40–72 wks