Cable Car
ProductOverview
A Cable Car is a street railway vehicle that carries no engine of its own. It is pulled along by a steel wire rope, the cable, that runs continuously in a conduit beneath the street and is driven from a central powerhouse. The car connects to that cable through a Grip Mechanism, a clamp the operator opens and closes by hand. The first line of this kind opened in San Francisco in 1873, and the surviving system there still works the same way. Because the cable moves at a fixed speed, the car has no throttle and no transmission. The operator, called the gripman, has only two decisions to make: grip the cable to go, or let go and brake to stop.
The Carbody is wooden, roughly 27 ft long, built on a steel-channel Body Sill Frame. It is split into an open front bay with outward-facing benches and an enclosed rear cabin. Two single-axle Truck Assembly units carry it on 3 ft 6 in gauge track. Those wheels only roll. They drive nothing, since every bit of tractive effort comes from the cable.
The Grip Mechanism
The grip is the part that makes a cable car a cable car. The gripman pulls the Grip Lever on the platform, and through a Grip Toggle Link and a Grip Cam Block that lever closes two Grip Jaw members onto the moving cable. The cable itself is never touched by bare steel that matters: the wearing surfaces are replaceable Grip Die inserts bolted into the jaw faces. A partial pull lets the dies slip on the cable so the car accelerates gently up to cable speed; a full pull clamps hard and the car is locked to the rope at the full 9.5 mph. A Grip Quadrant with a pawl holds the lever at the chosen position, and a heavy Grip Return Spring springs the jaws open the instant the gripman eases off. The dies take a brutal beating and are swapped out every few days; a Grip Take-up Screw takes up the wear between changes. Small Cable Guide Pulley sheaves steer the cable cleanly into and out of the jaws.
Grip Running Gear
Getting the grip down to the cable is its own problem. The cable rides in a conduit under the road, reached only through a narrow slot about 0.75 in wide between the rails. The Grip Shank is the vertical bar that drops through that slot, with a thin Slot Blade riding in the gap, the one part of the whole machine visible at street level. The shank hangs from a sliding Grip Carrier Frame under the body, kept centered by Grip Guide Roller rollers. Where two cable lines cross, one car must let its cable dip out of the way, and a Depression Bar pushes the rope down so the crossing line runs clear.
Braking
With no motor to brake against, a cable car carries four independent braking systems in its Brake System. The fastest input is the Cable Release Linkage: open the grip and the cable runs free, so the car simply coasts. For service stops the gripman uses the Track Brake, pressing long Pine Track Brake Shoe blocks of Monterey pine straight down onto the rail heads with the Track Brake Pedal. Under hard braking the pine actually scorches and partly fuses to the rail, so the shoes wear out in days and are treated as consumables. The conductor can add the Wheel Brake, cast-iron shoes drawn against the wheel treads by a Brake Hand Wheel and chain. The last resort is the Slot Brake: a steel Slot Brake Wedge driven down into the street slot, which jams the car so hard it sometimes has to be cut free afterward. All of it links back through the Brake Rigging of rods and levers.
Body and Trucks
The body framing is hardwood, with Oak Body Post posts on steel Steel Channel Sill sills, sheathed in tongue-and-groove Body Side Panel boards and topped by a raised Clerestory Roof for light and ventilation. Each end rides on a Truck Assembly built around a Truck Frame and a Wheelset of two Flanged Steel Wheel wheels pressed on an Axle Bar. Plain-bearing Axle Journal Box housings, each with a bronze Journal Bearing and an Oil Seal, support the axles, and Coil Spring truck springs cushion the Truck Bolster that carries the body Center Pin.
How the Gripman Works It
The crew stand at the Platform & Controls amidships. There is no controller and no throttle, only the Grip Lever, the Track Brake Pedal and the Slot Brake Lever for emergencies. Starting means slipping the grip onto the cable smoothly so passengers are not jolted; on a downgrade the gripman drops the cable entirely and rides the track brake to hold 9.5 mph. Approaching a stop, the gripman releases the cable and applies the pine shoes. The conductor signals with a Conductor Bell Cord, works the Wheel Brake, and collects fares at the Fare Box. A foot-rung Roof Gong, worked from the Foot Gong Treadle, warns traffic at every crossing.
Interior, Fittings and Variants
The Interior mixes outward-facing Open Bench seats with Reversible Seat Back backrests in the open bay and longitudinal Cabin Bench seating in the closed cabin, with Grab Strap straps for standees. Single-end cars must be turned on a turntable at each terminus because the grip and platform face one way; double-end designs avoid that. End fittings include Headlamp lamps, Route Sign boards, a brass Builder’s Plate and a slatted Wheel Guard (Pilot) wheel guard at each end to sweep the track clear. The whole vehicle is a study in doing one thing well: gripping a moving rope, and stopping safely once you let go of it.
Cable Car parts and their functions
8 top-level parts · 334 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Carbody 11 parts | 1× | Wooden open-and-closed body |
| 2 | Grip Mechanism 10 parts | 1× | Defining feature: clamps the moving cable |
| 3 | Grip Running Gear 6 parts | 1× | Carries the grip down through the slot |
| 4 | Brake System 5 parts | 1× | Four independent braking systems |
| 5 | Truck Assembly 6 parts | 2× | Front and rear running gear |
| 6 | Platform & Controls 6 parts | 1× | Gripman's standing platform |
| 7 | Interior 5 parts | 1× | Seats, benches, fittings |
| 8 | Bells & Fittings 6 parts | 1× | Bells, signs, lamps |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labourTap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cable Car
8 top-level lines · 114 rows shown · 334 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Carbody 11 parts | cable-car-streetcar-carbody | 1× | 1 | 101 | assembly |
| 1.1 | Body Sill Frame 3 parts | cable-car-streetcar-body-sill-frame | 1× | 1 | 17 | assembly |
| 1.1.1 | Steel Channel Sill | cable-car-streetcar-steel-channel-sill | 4× | 4 | · | part |
| 1.1.2 | Oak Body Post | cable-car-streetcar-oak-body-post | 12× | 12 | · | part |
| 1.1.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 1.2 | Body Bolster | cable-car-streetcar-body-bolster | 2× | 2 | · | part |
| 1.3 | Open Section Frame 3 parts | cable-car-streetcar-open-section-frame | 1× | 1 | 12 | assembly |
| 1.3.1 | Corner Post | cable-car-streetcar-corner-post | 4× | 4 | · | part |
| 1.3.2 | Roof Stanchion | cable-car-streetcar-roof-stanchion | 6× | 6 | · | part |
| 1.3.3 | Running Board | cable-car-streetcar-running-board | 2× | 2 | · | part |
| 1.4 | Closed Section Frame 3 parts | cable-car-streetcar-closed-section-frame | 1× | 1 | 8 | assembly |
| 1.4.1 | Cabin Wall Panel | cable-car-streetcar-cabin-wall-panel | 4× | 4 | · | part |
| 1.4.2 | Sliding Door | cable-car-streetcar-sliding-door | 2× | 2 | · | part |
| 1.4.3 | Door Track | cable-car-streetcar-door-track | 2× | 2 | · | part |
| 1.5 | Body Side Panel | cable-car-streetcar-body-side-panel | 2× | 2 | · | part |
| 1.6 | Body End Bulkhead | cable-car-streetcar-body-end-bulkhead | 2× | 2 | · | part |
| 1.7 | Clerestory Roof 3 parts | cable-car-streetcar-clerestory-roof | 1× | 1 | 29 | assembly |
| 1.7.1 | Roof Board | cable-car-streetcar-roof-board | 20× | 20 | · | part |
| 1.7.2 | Roof Canvas | cable-car-streetcar-roof-canvas | 1× | 1 | · | part |
| 1.7.3 | Clerestory Sash | cable-car-streetcar-clerestory-sash | 8× | 8 | · | part |
| 1.8 | Window Set 2 parts | cable-car-streetcar-window-set | 1× | 1 | 16 | assembly |
| 1.8.1 | Window Glass | cable-car-streetcar-window-glass | 8× | 8 | · | part |
| 1.8.2 | Window Sash | cable-car-streetcar-window-sash | 8× | 8 | · | part |
| 1.9 | Folding Step | cable-car-streetcar-folding-step | 4× | 4 | · | part |
| 1.10 | Grab Rail | cable-car-streetcar-grab-rail | 8× | 8 | · | part |
| 1.11 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 2 | Grip Mechanism 10 parts | cable-car-streetcar-grip-mechanism | 1× | 1 | 40 | assembly |
| 2.1 | Grip Lever | cable-car-streetcar-grip-lever | 1× | 1 | · | part |
| 2.2 | Grip Quadrant 3 parts | cable-car-streetcar-grip-quadrant | 1× | 1 | 3 | assembly |
| 2.2.1 | Quadrant Sector | cable-car-streetcar-quadrant-sector | 1× | 1 | · | part |
| 2.2.2 | Quadrant Pawl | cable-car-streetcar-quadrant-pawl | 1× | 1 | · | part |
| 2.2.3 | Coil Spring | coil-spring | 1× | 1 | · | part |
| 2.3 | Grip Jaw 3 parts | cable-car-streetcar-grip-jaw | 2× | 2 | 4 | assembly |
| 2.3.1 | Jaw Body | cable-car-streetcar-jaw-body | 1× | 2 | · | part |
| 2.3.2 | Grip Die | cable-car-streetcar-grip-die | 2× | 4 | · | part |
| 2.3.3 | Fastener Set | fastener-set | 1× | 2 | · | part |
| 2.4 | Grip Die | cable-car-streetcar-grip-die | 6× | 6 | · | part |
| 2.5 | Grip Take-up Screw | cable-car-streetcar-grip-screw | 1× | 1 | · | part |
| 2.6 | Grip Toggle Link | cable-car-streetcar-grip-toggle-link | 2× | 2 | · | part |
| 2.7 | Grip Cam Block | cable-car-streetcar-grip-cam-block | 1× | 1 | · | part |
| 2.8 | Grip Return Spring | cable-car-streetcar-grip-return-spring | 1× | 1 | · | part |
| 2.9 | Cable Guide Pulley 3 parts | cable-car-streetcar-cable-guide-pulley | 4× | 4 | 4 | assembly |
| 2.9.1 | Pulley Sheave | cable-car-streetcar-pulley-sheave | 1× | 4 | · | part |
| 2.9.2 | Ball Bearing | ball-bearing | 2× | 8 | · | part |
| 2.9.3 | Pulley Axle | cable-car-streetcar-pulley-axle | 1× | 4 | · | part |
| 2.10 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3 | Grip Running Gear 6 parts | cable-car-streetcar-grip-running-gear | 1× | 1 | 13 | assembly |
| 3.1 | Grip Shank | cable-car-streetcar-grip-shank | 1× | 1 | · | part |
| 3.2 | Grip Carrier Frame 3 parts | cable-car-streetcar-grip-carrier-frame | 1× | 1 | 5 | assembly |
| 3.2.1 | Carrier Slide | cable-car-streetcar-carrier-slide | 2× | 2 | · | part |
| 3.2.2 | Carrier Bracket | cable-car-streetcar-carrier-bracket | 2× | 2 | · | part |
| 3.2.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3.3 | Slot Blade | cable-car-streetcar-slot-blade | 1× | 1 | · | part |
| 3.4 | Depression Bar | cable-car-streetcar-depression-bar | 1× | 1 | · | part |
| 3.5 | Grip Guide Roller | cable-car-streetcar-grip-guide-roller | 4× | 4 | · | part |
| 3.6 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 4 | Brake System 5 parts | cable-car-streetcar-brake-system | 1× | 1 | 48 | assembly |
| 4.1 | Wheel Brake 4 parts | cable-car-streetcar-wheel-brake | 1× | 1 | 8 | assembly |
| 4.1.1 | Wheel Brake Shoe | cable-car-streetcar-wheel-brake-shoe | 4× | 4 | · | part |
| 4.1.2 | Brake Hand Wheel | cable-car-streetcar-brake-hand-wheel | 1× | 1 | · | part |
| 4.1.3 | Brake Chain | cable-car-streetcar-brake-chain | 1× | 1 | · | part |
| 4.1.4 | Brake Beam | cable-car-streetcar-brake-beam | 2× | 2 | · | part |
| 4.2 | Track Brake 4 parts | cable-car-streetcar-track-brake | 1× | 1 | 7 | assembly |
| 4.2.1 | Pine Track Brake Shoe | cable-car-streetcar-pine-brake-shoe | 2× | 2 | · | part |
| 4.2.2 | Track Brake Pedal | cable-car-streetcar-track-brake-pedal | 1× | 1 | · | part |
| 4.2.3 | Track Brake Lever | cable-car-streetcar-track-brake-lever | 2× | 2 | · | part |
| 4.2.4 | Coil Spring | coil-spring | 2× | 2 | · | part |
| 4.3 | Slot Brake 3 parts | cable-car-streetcar-slot-brake | 1× | 1 | 3 | assembly |
| 4.3.1 | Slot Brake Wedge | cable-car-streetcar-slot-brake-wedge | 1× | 1 | · | part |
| 4.3.2 | Slot Brake Lever | cable-car-streetcar-slot-brake-lever | 1× | 1 | · | part |
| 4.3.3 | Slot Brake Shaft | cable-car-streetcar-slot-brake-shaft | 1× | 1 | · | part |
| 4.4 | Cable Release Linkage 3 parts | cable-car-streetcar-cable-release | 1× | 1 | 4 | assembly |
| 4.4.1 | Release Lever | cable-car-streetcar-release-lever | 1× | 1 | · | part |
| 4.4.2 | Release Link | cable-car-streetcar-release-link | 2× | 2 | · | part |
| 4.4.3 | Coil Spring | coil-spring | 1× | 1 | · | part |
| 4.5 | Brake Rigging 3 parts | cable-car-streetcar-brake-rigging | 1× | 1 | 26 | assembly |
| 4.5.1 | Brake Rod | cable-car-streetcar-brake-rod | 6× | 6 | · | part |
| 4.5.2 | Brake Pin | cable-car-streetcar-brake-pin | 12× | 12 | · | part |
| 4.5.3 | Brake Clevis | cable-car-streetcar-brake-clevis | 8× | 8 | · | part |
| 5 | Truck Assembly 6 parts | cable-car-streetcar-truck-assembly | 2× | 2 | 25 | assembly |
| 5.1 | Truck Frame | cable-car-streetcar-truck-frame | 1× | 2 | · | part |
| 5.2 | Wheelset 2 parts | cable-car-streetcar-wheelset | 2× | 4 | 3 | assembly |
| 5.2.1 | Flanged Steel Wheel | cable-car-streetcar-flanged-wheel | 2× | 8 | · | part |
| 5.2.2 | Axle Bar | cable-car-streetcar-axle-bar | 1× | 4 | · | part |
| 5.3 | Axle Journal Box 3 parts | cable-car-streetcar-axle-journal-box | 4× | 8 | 3 | assembly |
| 5.3.1 | Journal Bearing | cable-car-streetcar-journal-bearing | 1× | 8 | · | part |
| 5.3.2 | Oil Seal | oil-seal | 1× | 8 | · | part |
| 5.3.3 | Journal Box Lid | cable-car-streetcar-journal-lid | 1× | 8 | · | part |
| 5.4 | Truck Bolster | cable-car-streetcar-truck-bolster | 1× | 2 | · | part |
| 5.5 | Coil Spring | coil-spring | 4× | 8 | · | part |
| 5.6 | Center Pin | cable-car-streetcar-center-pin | 1× | 2 | · | part |
| 6 | Platform & Controls 6 parts | cable-car-streetcar-platform-controls | 1× | 1 | 7 | assembly |
| 6.1 | Platform Deck | cable-car-streetcar-platform-deck | 1× | 1 | · | part |
| 6.2 | Grip Lever | cable-car-streetcar-grip-lever | 1× | 1 | · | part |
| 6.3 | Track Brake Pedal | cable-car-streetcar-track-brake-pedal | 1× | 1 | · | part |
| 6.4 | Slot Brake Lever | cable-car-streetcar-slot-brake-lever | 1× | 1 | · | part |
| 6.5 | Dash Shield | cable-car-streetcar-dash-shield | 2× | 2 | · | part |
| 6.6 | Foot Gong Treadle | cable-car-streetcar-foot-gong-treadle | 1× | 1 | · | part |
| 7 | Interior 5 parts | cable-car-streetcar-interior | 1× | 1 | 66 | assembly |
| 7.1 | Open Bench 3 parts | cable-car-streetcar-open-bench | 5× | 5 | 10 | assembly |
| 7.1.1 | Bench Slat | cable-car-streetcar-bench-slat | 8× | 40 | · | part |
| 7.1.2 | Bench Frame | cable-car-streetcar-bench-frame | 1× | 5 | · | part |
| 7.1.3 | Reversible Seat Back | cable-car-streetcar-reversible-back | 1× | 5 | · | part |
| 7.2 | Cabin Bench | cable-car-streetcar-cabin-bench | 2× | 2 | · | part |
| 7.3 | Grab Strap | cable-car-streetcar-interior-grab-strap | 12× | 12 | · | part |
| 7.4 | Floor Board | cable-car-streetcar-floor-board | 1× | 1 | · | part |
| 7.5 | Fare Box | cable-car-streetcar-fare-box | 1× | 1 | · | part |
| 8 | Bells & Fittings 6 parts | cable-car-streetcar-bell-fittings | 1× | 1 | 9 | assembly |
| 8.1 | Roof Gong | cable-car-streetcar-roof-gong | 1× | 1 | · | part |
| 8.2 | Conductor Bell Cord | cable-car-streetcar-conductor-bell-cord | 1× | 1 | · | part |
| 8.3 | Route Sign | cable-car-streetcar-route-sign | 2× | 2 | · | part |
| 8.4 | Headlamp | cable-car-streetcar-headlamp | 2× | 2 | · | part |
| 8.5 | Builder’s Plate | cable-car-streetcar-builder-plate | 1× | 1 | · | part |
| 8.6 | Wheel Guard (Pilot) | cable-car-streetcar-cow-catcher | 2× | 2 | · | part |
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $500k–$60M. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳CRRC
crrcgc.cc ↗
|
Beijing, CN | Rolling stock & rail systems | made to order | 40–72 wks |
|
🇫🇷Alstom
alstom.com ↗
|
Saint-Ouen, FR | Rail rolling stock | made to order | 40–72 wks |
| mobility.siemens.com ↗ | Munich, DE | Rail systems | made to order | 40–72 wks |
| stadlerrail.com ↗ | Bussnang, CH | Rail rolling stock | made to order | 40–72 wks |
|
🇺🇸Wabtec
wabteccorp.com ↗
|
Pittsburgh, US | Rail equipment | made to order | 40–72 wks |
1,145-word article