Snow Clearing Train (Rotary Plow) Product
Overview
A rotary snow clearing train removes deep, packed, or drifted snow that a simple wedge plough cannot push aside. Instead of shoving snow ahead of it, the machine cuts into the drift with a rotating auger and hurls the snow well clear of the track with a high-speed impeller. This lets it open lines blocked by metres of snow on mountain passes and exposed routes, where the volume of snow would otherwise overwhelm a plough blade.
The train is self-propelled and works at low speed against heavy resistance, so it pairs a powerful prime mover with a robust front rotary head. The body rides on two Railway Bogie running-gear units, and a heated Operator Cab gives the crew a clear view of the snow face ahead.
How it works
The Diesel Engine supplies both traction and the large power demand of clearing. At the front, the Rotary Snow Head does the cutting: a Rotary Drive Motor drives, through the Rotary Reduction Gearbox, a Cutting Auger that bites into the snow and feeds it inward to a Throwing Impeller that flings it out under high speed. The thrown snow passes into the Discharge Chute, whose Chute Rotation Motor aims it to whichever side of the track is clear, away from the line, structures, and the crew.
To clear the full track gauge and widen the swath, the Flanger & Side Wings assembly drops a Flanger Blade between the rails and spreads Side Wing Plough ploughs outward, all positioned by hydraulic Wing Hydraulic Cylinder actuators fed from the Hydraulic System. The operator controls head speed, chute direction, and the wings from the Cab Control Display in the cab, while a 12 V Battery bank starts the engine and powers control and lighting circuits.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labourTap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
9 top-level lines · 86 rows shown · 243 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Carbody & Underframe 4 parts | sct-carbody | 1× | 1 | 10 | assembly |
| 1.1 | Welded Steel Underframe | sct-underframe | 1× | 1 | — | part |
| 1.2 | Carbody Shell | sct-carbody-shell | 1× | 1 | — | part |
| 1.3 | Automatic Coupler | sct-coupler | 2× | 2 | — | part |
| 1.4 | Fastener Set | fastener-set | 6× | 6 | — | part |
| 2 | Diesel Engine 6 parts | sct-diesel-engine | 1× | 1 | 34 | assembly |
| 2.1 | Engine Block | sct-engine-block | 1× | 1 | — | part |
| 2.2 | Piston Assembly 3 parts | sct-piston-assembly | 6× | 6 | 3 | assembly |
| 2.2.1 | Piston | sct-piston | 1× | 6 | — | part |
| 2.2.2 | Connecting Rod | sct-conrod | 1× | 6 | — | part |
| 2.2.3 | Piston Ring Set | sct-piston-rings | 1× | 6 | — | part |
| 2.3 | Crankshaft | sct-crankshaft | 1× | 1 | — | part |
| 2.4 | Turbocharger 3 parts | sct-turbocharger | 1× | 1 | 5 | assembly |
| 2.4.1 | Turbine/Compressor Wheel | sct-turbine-wheel | 1× | 1 | — | part |
| 2.4.2 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 2.4.3 | Oil Seal | oil-seal | 2× | 2 | — | part |
| 2.5 | Fuel Injection System 3 parts | sct-fuel-system | 1× | 1 | 8 | assembly |
| 2.5.1 | Fuel Pump | sct-fuel-pump | 1× | 1 | — | part |
| 2.5.2 | Fuel Injector | sct-fuel-injector | 6× | 6 | — | part |
| 2.5.3 | Diesel Fuel Tank | sct-fuel-tank | 1× | 1 | — | part |
| 2.6 | Engine Radiator | sct-radiator | 1× | 1 | — | part |
| 3 | Rotary Snow Head 6 parts | sct-rotary-head | 1× | 1 | 42 | assembly |
| 3.1 | Cutting Auger | sct-auger | 1× | 1 | — | part |
| 3.2 | Throwing Impeller | sct-impeller | 1× | 1 | — | part |
| 3.3 | Rotary Drive Motor 5 parts | sct-rotary-motor | 1× | 1 | 26 | assembly |
| 3.3.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 3.3.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 3.3.3 | Copper Winding | copper-winding | 1× | 1 | — | part |
| 3.3.4 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 3.3.5 | Motor Housing | motor-housing | 1× | 1 | — | part |
| 3.4 | Rotary Reduction Gearbox 4 parts | sct-rotary-gearbox | 1× | 1 | 9 | assembly |
| 3.4.1 | Gearbox Housing | gearbox-housing | 1× | 1 | — | part |
| 3.4.2 | Helical Gear Pair | gear-pair | 2× | 2 | — | part |
| 3.4.3 | Ball Bearing | ball-bearing | 4× | 4 | — | part |
| 3.4.4 | Oil Seal | oil-seal | 2× | 2 | — | part |
| 3.5 | Ball Bearing | ball-bearing | 4× | 4 | — | part |
| 3.6 | Rotary Head Housing | sct-head-housing | 1× | 1 | — | part |
| 4 | Discharge Chute 3 parts | sct-discharge-chute | 1× | 1 | 27 | assembly |
| 4.1 | Chute Body | sct-chute-body | 1× | 1 | — | part |
| 4.2 | Chute Rotation Motor 4 parts | sct-chute-rotation-motor | 1× | 1 | 25 | assembly |
| 4.2.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 4.2.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 4.2.3 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 4.2.4 | Helical Gear Pair | gear-pair | 1× | 1 | — | part |
| 4.3 | Chute Deflector | sct-chute-deflector | 1× | 1 | — | part |
| 5 | Flanger & Side Wings 3 parts | sct-flanger-wings | 1× | 1 | 19 | assembly |
| 5.1 | Flanger Blade | sct-flanger-blade | 1× | 1 | — | part |
| 5.2 | Side Wing Plough | sct-side-wing | 2× | 2 | — | part |
| 5.3 | Wing Hydraulic Cylinder 3 parts | sct-wing-cylinder | 4× | 4 | 4 | assembly |
| 5.3.1 | Cylinder Tube | sct-cylinder-tube | 1× | 4 | — | part |
| 5.3.2 | Cylinder Rod | sct-cylinder-rod | 1× | 4 | — | part |
| 5.3.3 | O-Ring Set | oring-set | 2× | 8 | — | part |
| 6 | Hydraulic System 3 parts | sct-hydraulic-system | 1× | 1 | 35 | assembly |
| 6.1 | Hydraulic Pump Unit 4 parts | sct-hydraulic-pump | 1× | 1 | 25 | assembly |
| 6.1.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 6.1.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 6.1.3 | Ball Bearing | ball-bearing | 2× | 2 | — | part |
| 6.1.4 | O-Ring Set | oring-set | 1× | 1 | — | part |
| 6.2 | Hydraulic Valve Block 3 parts | sct-valve-block | 1× | 1 | 9 | assembly |
| 6.2.1 | Manifold Valve Body | sct-valve-body | 1× | 1 | — | part |
| 6.2.2 | Relay | relay | 6× | 6 | — | part |
| 6.2.3 | O-Ring Set | oring-set | 2× | 2 | — | part |
| 6.3 | Hydraulic Reservoir | sct-hydraulic-tank | 1× | 1 | — | part |
| 7 | Railway Bogie 5 parts | bogie | 2× | 2 | 27 | assembly |
| 7.1 | Bogie Frame | bogie-frame | 1× | 2 | — | part |
| 7.2 | Wheelset 2 parts | bogie-wheelset | 2× | 4 | 3 | assembly |
| 7.2.1 | Wheelset Axle | bogie-axle | 1× | 4 | — | part |
| 7.2.2 | Rail Wheel | bogie-wheel | 2× | 8 | — | part |
| 7.3 | Axlebox Bearing 2 parts | bogie-axle-bearing | 4× | 8 | 3 | assembly |
| 7.3.1 | Ball Bearing | ball-bearing | 1× | 8 | — | part |
| 7.3.2 | Oil Seal | oil-seal | 2× | 16 | — | part |
| 7.4 | Coil Spring | coil-spring | 4× | 8 | — | part |
| 7.5 | Air Spring | bogie-air-spring | 4× | 8 | — | part |
| 8 | Operator Cab 3 parts | sct-cab | 1× | 1 | 18 | assembly |
| 8.1 | Seat Assembly 5 parts | seat-assembly | 2× | 2 | 7 | assembly |
| 8.1.1 | Seat Frame | seat-frame | 1× | 2 | — | part |
| 8.1.2 | Seat Foam | seat-foam | 2× | 4 | — | part |
| 8.1.3 | Seat Cover | seat-cover | 1× | 2 | — | part |
| 8.1.4 | Seat Motor | seat-motor | 2× | 4 | — | part |
| 8.1.5 | Seat Heater Mat | seat-heater | 1× | 2 | — | part |
| 8.2 | Cab Control Display 3 parts | sct-display | 1× | 1 | 3 | assembly |
| 8.2.1 | LCD Panel | lcd-panel | 1× | 1 | — | part |
| 8.2.2 | Bare PCB | pcb-bare | 1× | 1 | — | part |
| 8.2.3 | Microcontroller | mcu | 1× | 1 | — | part |
| 8.3 | Cab Shell | sct-cab-shell | 1× | 1 | — | part |
| 9 | 12 V Battery | lv-battery | 4× | 4 | — | part |
Sourcing — likely vendors
Companies that make this · indicative price $500k–$60M · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| 🇨🇳CRRC crrcgc.cc ↗ | Beijing, CN | Rolling stock & rail systems | made to order | 40–72 wks |
| 🇫🇷Alstom alstom.com ↗ | Saint-Ouen, FR | Rail rolling stock | made to order | 40–72 wks |
| mobility.siemens.com ↗ | Munich, DE | Rail systems | made to order | 40–72 wks |
| stadlerrail.com ↗ | Bussnang, CH | Rail rolling stock | made to order | 40–72 wks |
| 🇺🇸Wabtec wabteccorp.com ↗ | Pittsburgh, US | Rail equipment | made to order | 40–72 wks |
296-word article