Brake equipment
AssemblyAxle-mounted disc brakes with hydraulic-pneumatic calipers and an automatic slack adjuster that convert kinetic energy to heat at the friction faces. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Brake equipment parts and their functions
7 top-level parts · 29 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Brake Disc (rotor) | 4× | Two discs per axle |
| 2 | Brake caliper | 4× | Caliper per disc |
| 3 | Brake cylinder | 4× | Pneumatic actuators |
| 4 | Brake Pad Set | 4× | Friction pads |
| 5 | Slack adjuster | 4× | Automatic clearance |
| 6 | Brake hose | 8× | Flexible lines |
| 7 | Fastener Set | 1× | Caliper hardware |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Brake equipment
7 top-level lines · 7 rows shown · 29 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Brake Disc (rotor) | brake-disc | 4× | 4 | · | part |
| 2 | Brake caliper | bg-brake-caliper | 4× | 4 | · | part |
| 3 | Brake cylinder | bg-brake-cylinder | 4× | 4 | · | part |
| 4 | Brake Pad Set | brake-pad-set | 4× | 4 | · | part |
| 5 | Slack adjuster | bg-slack-adjuster | 4× | 4 | · | part |
| 6 | Brake hose | bg-brake-hose | 8× | 8 | · | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the brake equipment is used
7 products across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |