Safety Appliances
AssemblyLadders, grab irons, sill steps, and platforms required by regulation so crews can climb and ride the car safely. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Safety Appliances parts and their functions
6 top-level parts · 26 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | End Ladder | 2× | End vertical ladders |
| 2 | Grab Iron | 12× | Hand-hold grab irons |
| 3 | Sill Step | 4× | Corner stirrup steps |
| 4 | Running Board | 2× | End platform walkways |
| 5 | Uncoupling Lever | 2× | Cut levers for coupler |
| 6 | Placard Board | 4× | Placard and reporting mounts |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Safety Appliances
6 top-level lines · 6 rows shown · 26 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | End Ladder | boxcar-end-ladder | 2× | 2 | · | part |
| 2 | Grab Iron | boxcar-grab-iron | 12× | 12 | · | part |
| 3 | Sill Step | boxcar-sill-step | 4× | 4 | · | part |
| 4 | Running Board | boxcar-running-board | 2× | 2 | · | part |
| 5 | Uncoupling Lever | boxcar-uncoupling-lever | 2× | 2 | · | part |
| 6 | Placard Board | boxcar-placard-board | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the safety appliances is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |