Docking & Guidance System
AssemblyOptical and kerb-following guidance that aligns the doors to the platform with a small gap. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Docking & Guidance System
4 top-level lines as of r20065| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Guidance Camera 3 parts | bus-rapid-transit-vehicle-guidance-camera | 2× | 2 | 0 | assembly |
| 2 | Kerb Distance Sensor | bus-rapid-transit-vehicle-kerb-sensor | 4× | 4 | · | part |
| 3 | Guidance ECU 4 parts | bus-rapid-transit-vehicle-guidance-ecu | 1× | 1 | 0 | assembly |
| 4 | Kerb Guide Roller 3 parts | bus-rapid-transit-vehicle-guide-roller | 2× | 2 | 0 | assembly |