Interior
AssemblySeating for both sections: outward-facing benches in the open bay and longitudinal benches in the closed cabin. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Interior parts and their functions
5 top-level parts · 66 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Open Bench 3 parts | 5× | Transverse open-air benches |
| 2 | Cabin Bench | 2× | Longitudinal cabin benches |
| 3 | Grab Strap | 12× | Standee straps |
| 4 | Floor Board | 1× | Cabin floor planking |
| 5 | Fare Box | 1× | Coin fare box |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Interior
5 top-level lines · 8 rows shown · 66 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Open Bench 3 parts | cable-car-streetcar-open-bench | 5× | 5 | 10 | assembly |
| 1.1 | Bench Slat | cable-car-streetcar-bench-slat | 8× | 40 | · | part |
| 1.2 | Bench Frame | cable-car-streetcar-bench-frame | 1× | 5 | · | part |
| 1.3 | Reversible Seat Back | cable-car-streetcar-reversible-back | 1× | 5 | · | part |
| 2 | Cabin Bench | cable-car-streetcar-cabin-bench | 2× | 2 | · | part |
| 3 | Grab Strap | cable-car-streetcar-interior-grab-strap | 12× | 12 | · | part |
| 4 | Floor Board | cable-car-streetcar-floor-board | 1× | 1 | · | part |
| 5 | Fare Box | cable-car-streetcar-fare-box | 1× | 1 | · | part |
Where the interior is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |