BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Crew Interior

Assembly

Living and working space for the conductor and rear brakeman: a desk, bunk, lockers, a small galley counter, and water and toilet provisions. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Crew Interior parts and their functions

6 top-level parts · 8 parts in total · full bill of materials below
Crew Interior parts diagram: 1 conductor desk, 2 crew bunk, 3 storage locker, 4 galley counter, 5 water tank, 6 hopper toilet. 8 parts in 6 top-level items.
Crew Interior parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Conductor Desk 1× Conductor desk
2 Crew Bunk 2× Crew bunks
3 Storage Locker 2× Storage lockers
4 Galley Counter 1× Galley counter
5 Water Tank 1× Water tank
6 Hopper Toilet 1× Toilet

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Crew Interior

6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Conductor Desk caboose-desk 1× 1 · part
2 Crew Bunk caboose-bunk 2× 2 · part
3 Storage Locker caboose-locker 2× 2 · part
4 Galley Counter caboose-galley 1× 1 · part
5 Water Tank caboose-water-tank 1× 1 · part
6 Hopper Toilet caboose-toilet 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the crew interior is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks