BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Heating Stove

Assembly

Coal or oil cast-iron stove with a flue, fuel bin, and a shielded hearth, the primary heat source for the crew. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Heating Stove parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Heating Stove parts diagram: 1 cast-iron stove body, 2 stove flue & roof jack, 3 fuel bin, 4 heat shield. 4 parts in 4 top-level items.
Heating Stove parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cast-Iron Stove Body 1×
2 Stove Flue & Roof Jack 1× Flue + roof jack
3 Fuel Bin 1× Coal or oil storage beside the stove.
4 Heat Shield 1× Sheet-metal shield protecting nearby woodwork.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Heating Stove

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cast-Iron Stove Body caboose-stove-body 1× 1 · part
2 Stove Flue & Roof Jack caboose-stove-flue 1× 1 · part
3 Fuel Bin caboose-fuel-bin 1× 1 · part
4 Heat Shield caboose-heat-shield 1× 1 · part

Where the heating stove is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks