BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

You are viewing r50295 of this page, not the current version. Go to current · history

Derrick

Assembly

Bolted lattice tower ~65 m above the drill floor with two load paths (main and auxiliary) rated around 1,250 short tons each; tens of thousands of high-strength bolts hold it together. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Derrick

4 top-level lines as of r50295
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Derrick Lattice Member drillship-derrick-member 2400× 2,400 · part
2 Derrick Bolt Set drillship-derrick-bolts 95000× 95,000 · part
3 Crown Block drillship-crown-block 1× 1 · part
4 Ball Bearing ball-bearing 12× 12 · part