Safety Appliances
AssemblyGrab irons, ladders, steps, and end platforms required for crew to climb and ride the car safely. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Safety Appliances parts and their functions
6 top-level parts · 24 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Side Ladder | 2× | Side access ladder |
| 2 | End Ladder | 2× | End access ladder |
| 3 | Grab Iron | 12× | Climbing grab iron |
| 4 | Sill Step | 4× | Bottom sill step |
| 5 | Running Board | 2× | End running board |
| 6 | Fastener Set | 2× | Appliance mounting hardware |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Safety Appliances
6 top-level lines · 6 rows shown · 24 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Side Ladder | gondola-car-side-ladder | 2× | 2 | · | part |
| 2 | End Ladder | gondola-car-end-ladder | 2× | 2 | · | part |
| 3 | Grab Iron | gondola-car-grab-iron | 12× | 12 | · | part |
| 4 | Sill Step | gondola-car-sill-step | 4× | 4 | · | part |
| 5 | Running Board | gondola-car-running-board | 2× | 2 | · | part |
| 6 | Fastener Set | fastener-set | 2× | 2 | · | part |
Where the safety appliances is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |