Heat Medium System
AssemblyA fired heater or reboiler supplies the heat that reconcentrates the recovered inhibitor and prevents the warm gas path from chilling below hydrate temperature. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Heat Medium System parts and their functions
4 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Fired Heater 4 parts | 1× | Indirect bath or fired heater warming the heat medium loop. |
| 2 | Process Heat Coil | 1× | |
| 3 | Heat Medium Pump 3 parts | 1× | |
| 4 | Expansion Tank | 1× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Heat Medium System
4 top-level lines · 14 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Fired Heater 4 parts | jts-fired-heater | 1× | 1 | 6 | assembly |
| 1.1 | Heater Vessel | jts-heater-vessel | 1× | 1 | · | part |
| 1.2 | Gas Burner 3 parts | jts-burner | 1× | 1 | 3 | assembly |
| 1.2.1 | Burner Nozzle | jts-burner-nozzle | 1× | 1 | · | part |
| 1.2.2 | Pilot Assembly | jts-pilot | 1× | 1 | · | part |
| 1.2.3 | Flame Arrestor | jts-flame-arrestor | 1× | 1 | · | part |
| 1.3 | Firetube | jts-firetube | 1× | 1 | · | part |
| 1.4 | RTD Temperature Probe | temperature-rtd | 1× | 1 | · | part |
| 2 | Process Heat Coil | jts-heat-coil | 1× | 1 | · | part |
| 3 | Heat Medium Pump 3 parts | jts-circulation-pump | 1× | 1 | 4 | assembly |
| 3.1 | Pump Hydraulic End | jts-cond-pump-head | 1× | 1 | · | part |
| 3.2 | Pump Motor | jts-pump-motor | 1× | 1 | · | part |
| 3.3 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 4 | Expansion Tank | jts-expansion-tank | 1× | 1 | · | part |
Where the heat medium system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |