Panoramic Glazing
AssemblyOversized side picture windows and a raised glass dome giving passengers an unobstructed view of the landscape. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Panoramic Glazing parts and their functions
6 top-level parts · 30 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Picture Window | 12× | Large fixed side windows |
| 2 | Dome Glazing | 1× | Raised roof viewing dome |
| 3 | Rear Window | 1× | Curved rear-end window |
| 4 | Window Frame | 14× | Glazing frames and gaskets |
| 5 | Solar Control Film | 1× | Tinted solar control film |
| 6 | O-Ring Set | 1× | Glazing weather seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Panoramic Glazing
6 top-level lines · 6 rows shown · 30 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Picture Window | observation-car-picture-window | 12× | 12 | · | part |
| 2 | Dome Glazing | observation-car-dome-glazing | 1× | 1 | · | part |
| 3 | Rear Window | observation-car-rear-window | 1× | 1 | · | part |
| 4 | Window Frame | observation-car-window-frame | 14× | 14 | · | part |
| 5 | Solar Control Film | observation-car-solar-film | 1× | 1 | · | part |
| 6 | O-Ring Set | oring-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the panoramic glazing is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |