BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Open Upper Deck

Assembly

Roofless upper deck with weather-resistant seating, drainage, perimeter guarding, and a part-height front wind deflector. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Open Upper Deck parts and their functions

6 top-level parts · 82 parts in total · full bill of materials below
Open Upper Deck parts diagram: 1 open-deck seat, 2 perimeter guard rail, 3 wind deflector, 4 deck drainage, 5 grab pole, 6 deck lighting. 82 parts in 6 top-level items.
Open Upper Deck parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Open-Deck Seat 30× Open-deck seats
2 Perimeter Guard Rail 3 parts 1× Perimeter guard rail and glazing
3 Wind Deflector 1× Front wind and rain deflector
4 Deck Drainage 1× Floor drainage channels and scuppers
5 Grab Pole 8× Vertical grab poles
6 Deck Lighting 3 parts 1× Low-level deck and step lighting

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Open Upper Deck

6 top-level lines · 12 rows shown · 82 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Open-Deck Seat open-top-tour-bus-upper-seat 30× 30 · part
2 Perimeter Guard Rail 3 parts open-top-tour-bus-perimeter-rail 1× 1 29 assembly
2.1 Guard Glass Panel open-top-tour-bus-glass-panel 14× 14 · part
2.2 Rail Post open-top-tour-bus-rail-post 14× 14 · part
2.3 Fastener Set fastener-set 1× 1 · part
3 Wind Deflector open-top-tour-bus-wind-deflector 1× 1 · part
4 Deck Drainage open-top-tour-bus-deck-drainage 1× 1 · part
5 Grab Pole open-top-tour-bus-grab-pole 8× 8 · part
6 Deck Lighting 3 parts open-top-tour-bus-deck-lighting 1× 1 13 assembly
6.1 LED Strip open-top-tour-bus-led-strip 6× 6 · part
6.2 Wire Bundle wire-bundle 1× 1 · part
6.3 Connector connector 6× 6 · part

Something wrong in this list? Report a problem with this BOM.

Where the open upper deck is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks