BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Measuring Wagon

Assembly

Trailing car with laser and inertial sensors continuously profiling rail geometry and assessing milling effectiveness. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Measuring Wagon parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Measuring Wagon parts diagram: 1 laser profile sensor, 2 IMU array, 3 acoustic sensor, 4 data logger, 5 encoder. 5 parts in 5 top-level items.
Measuring Wagon parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Laser Profile Sensor 1× Multi-point laser height sensor array
2 IMU Array 1× Accelerometer cluster for dynamic profile
3 Acoustic Sensor 1× Contact stress monitoring microphone
4 Data Logger 1× Onboard PC recording and archiving measurements
5 Encoder 1× Odometer for position correlation

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Measuring Wagon

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Laser Profile Sensor rail-milling-train-laser-profile 1× 1 · part
2 IMU Array rail-milling-train-imu-array 1× 1 · part
3 Acoustic Sensor rail-milling-train-acoustic-sensor 1× 1 · part
4 Data Logger rail-milling-train-data-logger 1× 1 · part
5 Encoder encoder 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the measuring wagon is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks