Hydraulic Clamp Assembly
AssemblyMobile end-stop jaw clamping rail ends with position feedback for precise threading and welding setup alignment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Hydraulic Clamp Assembly parts and their functions
5 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Clamp Jaw | 1× | Movable clamping jaw assembly |
| 2 | Clamp Cylinder | 1× | Main clamping force actuator |
| 3 | Jaw Pad | 2× | Replaceable hardened contact pads |
| 4 | Position Sensor | 1× | LVDT measuring jaw position |
| 5 | Load Cell | 1× | Force transducer for clamp pressure feedback |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Hydraulic Clamp Assembly
5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Clamp Jaw | rail-threading-machine-clamp-jaw | 1× | 1 | · | part |
| 2 | Clamp Cylinder | rail-threading-machine-clamp-cylinder | 1× | 1 | · | part |
| 3 | Jaw Pad | rail-threading-machine-jaw-pad | 2× | 2 | · | part |
| 4 | Position Sensor | rail-threading-machine-clamp-position-sensor | 1× | 1 | · | part |
| 5 | Load Cell | rail-threading-machine-clamp-load-cell | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the hydraulic clamp assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |