BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Base Carriage Frame and Locators

Assembly

Welded steel base frame with four jack mounting pads, alignment pins, and load measurement points. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Base Carriage Frame and Locators parts and their functions

5 top-level parts · 14 parts in total · full bill of materials below
Base Carriage Frame and Locators parts diagram: 1 base frame, 2 jack mounting pad, 3 locating pin set, 4 frame brace, 5 load cell bracket. 14 parts in 5 top-level items.
Base Carriage Frame and Locators parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Frame 1× Main structural base plate or box frame
2 Jack Mounting Pad 4× Mounting pads under each jack
3 Locating Pin Set 1× Spring-loaded or fixed locating pins positioning locomotive
4 Frame Brace 4× Diagonal cross-braces resisting side loads
5 Load Cell Bracket 4× Brackets mounting load cells under pads

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Base Carriage Frame and Locators

5 top-level lines · 5 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Frame railway-lifting-jacks-frame-base 1× 1 · part
2 Jack Mounting Pad railway-lifting-jacks-jack-pad 4× 4 · part
3 Locating Pin Set railway-lifting-jacks-locating-pin-set 1× 1 · part
4 Frame Brace railway-lifting-jacks-frame-bracing 4× 4 · part
5 Load Cell Bracket railway-lifting-jacks-load-cell-mount 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the base carriage frame and locators is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks