BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Signal Head

Assembly

The weatherproof housing that stacks the individual light units, with a background plate that makes the aspects readable against daylight sky. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Signal Head parts and their functions

6 top-level parts · 7 parts in total · full bill of materials below
Signal Head parts diagram: 1 head housing, 2 background plate, 3 rear access door, 4 alignment mount, 5 o-ring set, 6 fastener set. 7 parts in 6 top-level items.
Signal Head parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Head Housing 1× Cast aluminium
2 Background Plate 1× Matte black target plate
3 Rear Access Door 1× Rear maintenance door
4 Alignment Mount 1× Pan/tilt sighting mount
5 O-Ring Set 1× Door and gland seals
6 Fastener Set 2× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Signal Head

6 top-level lines · 6 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Head Housing railway-signal-head-housing 1× 1 · part
2 Background Plate railway-signal-backboard 1× 1 · part
3 Rear Access Door railway-signal-access-door 1× 1 · part
4 Alignment Mount railway-signal-alignment-mount 1× 1 · part
5 O-Ring Set oring-set 1× 1 · part
6 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the signal head is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks