BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Refrigeration Unit

Assembly

Mechanical vapor-compression cooling system with compressor, condenser, and evaporator coils. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Refrigeration Unit parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Refrigeration Unit parts diagram: 1 refrigeration compressor, 2 condenser coil, 3 evaporator coil, 4 expansion valve, 5 refrigerant charge, 6 receiver tank. 6 parts in 6 top-level items.
Refrigeration Unit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Refrigeration Compressor 1× Piston or rotary compressor
2 Condenser Coil 1× Heat rejection coil and fan
3 Evaporator Coil 1× Cargo-space cooling coil
4 Expansion Valve 1× Refrigerant flow control
5 Refrigerant Charge 1× HFC or HFO refrigerant charge
6 Receiver Tank 1× Liquid refrigerant storage

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Refrigeration Unit

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Refrigeration Compressor refrigerated-railcar-compressor 1× 1 · part
2 Condenser Coil refrigerated-railcar-condenser 1× 1 · part
3 Evaporator Coil refrigerated-railcar-evaporator 1× 1 · part
4 Expansion Valve refrigerated-railcar-expansion-valve 1× 1 · part
5 Refrigerant Charge refrigerated-railcar-refrigerant 1× 1 · part
6 Receiver Tank refrigerated-railcar-receiver-tank 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the refrigeration unit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks