BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Electrical and Lighting System

Assembly

Power distribution, battery, lighting and the cab and chute heating loads. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrical and Lighting System parts and their functions

10 top-level parts · 30 parts in total · full bill of materials below
Electrical and Lighting System parts diagram: 1 battery, 2 alternator, 3 distribution panel, 4 power supply, 5 headlight, 6 work light, 7 marker light, 8 relay, 9 wire bundle, 10 connector. 30 parts in 10 top-level items.
Electrical and Lighting System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Battery 2× Starting and control batteries
2 Alternator 1× Engine-driven alternator charging the batteries
3 Distribution Panel 1× Breaker and fuse distribution panel
4 Power Supply 1× Low-voltage supply for control electronics
5 Headlight 2× High-output work headlights on the cutter end
6 Work Light 4× Flood work lights lighting the snow bank
7 Marker Light 4× Marker and warning lights
8 Relay 6× Load relays for lighting and heater circuits
9 Wire Bundle 1× Main electrical wiring harness
10 Connector 8× Distribution and lighting connectors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrical and Lighting System

10 top-level lines · 10 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Battery rotary-snow-blower-train-battery 2× 2 · part
2 Alternator rotary-snow-blower-train-alternator 1× 1 · part
3 Distribution Panel rotary-snow-blower-train-distribution-panel 1× 1 · part
4 Power Supply power-supply 1× 1 · part
5 Headlight rotary-snow-blower-train-headlight 2× 2 · part
6 Work Light rotary-snow-blower-train-work-light 4× 4 · part
7 Marker Light rotary-snow-blower-train-marker-light 4× 4 · part
8 Relay relay 6× 6 · part
9 Wire Bundle wire-bundle 1× 1 · part
10 Connector connector 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the electrical and lighting system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks