Current Collection System
AssemblyBecause the running tires are insulating, traction power at 750 V DC is drawn through sliding shoes that bear against lateral power bars mounted alongside the guide bars; the steel running rails serve as the return path. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Current Collection System parts and their functions
4 top-level parts · 22 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Lateral Power Collector Shoe 2 parts | 4× | Lateral collector shoes |
| 2 | Sprung Shoe Gear 2 parts | 4× | Sprung shoe holders |
| 3 | Negative Return Brush | 2× | Negative return brush to rail |
| 4 | HV Junction Box 4 parts | 1× | High-voltage junction box |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Current Collection System
4 top-level lines · 12 rows shown · 22 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lateral Power Collector Shoe 2 parts | rubber-tyred-metro-power-shoe | 4× | 4 | 2 | assembly |
| 1.1 | Carbon Contact Shoe | rubber-tyred-metro-carbon-shoe | 1× | 4 | · | part |
| 1.2 | Shoe Feed Cable | rubber-tyred-metro-shoe-cable | 1× | 4 | · | part |
| 2 | Sprung Shoe Gear 2 parts | rubber-tyred-metro-shoe-gear | 4× | 4 | 2 | assembly |
| 2.1 | Coil Spring | coil-spring | 1× | 4 | · | part |
| 2.2 | Shoe Pivot Arm | rubber-tyred-metro-shoe-arm | 1× | 4 | · | part |
| 3 | Negative Return Brush | rubber-tyred-metro-return-brush | 2× | 2 | · | part |
| 4 | HV Junction Box 4 parts | rubber-tyred-metro-hv-junction | 1× | 1 | 4 | assembly |
| 4.1 | High-Speed Line Breaker | rubber-tyred-metro-line-breaker | 1× | 1 | · | part |
| 4.2 | Surge Arrester | rubber-tyred-metro-surge-arrester | 1× | 1 | · | part |
| 4.3 | HV Fuse | rubber-tyred-metro-hv-fuse | 1× | 1 | · | part |
| 4.4 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the current collection system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |