Crew Cab
AssemblyFootplate cab for driver and fireman, holding the boiler controls and gauges. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Crew Cab parts and their functions
5 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cab Shell | 1× | Sheet-steel cab structure with roof and side sheets enclosing the footplate. |
| 2 | Boiler Pressure Gauge | 2× | Bourdon gauge showing boiler steam pressure. |
| 3 | Water Level Gauge | 2× | Glass gauge showing water level in the boiler. |
| 4 | Steam Whistle | 1× | Steam-blown whistle used for warning and signaling. |
| 5 | Mechanical Lubricator | 1× | Pump feeding oil to cylinders and valves with the steam. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Crew Cab
5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cab Shell | steam-locomotive-cab-shell | 1× | 1 | · | part |
| 2 | Boiler Pressure Gauge | steam-locomotive-pressure-gauge | 2× | 2 | · | part |
| 3 | Water Level Gauge | steam-locomotive-water-gauge | 2× | 2 | · | part |
| 4 | Steam Whistle | steam-locomotive-whistle | 1× | 1 | · | part |
| 5 | Mechanical Lubricator | steam-locomotive-lubricator | 1× | 1 | · | part |
Where the crew cab is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |