Tender
AssemblyAttached car carrying the coal or oil and the water supply for the boiler. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tender parts and their functions
5 top-level parts · 36 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tender Frame | 1× | Underframe carrying the tank, bunker, and trucks. |
| 2 | Water Tank | 1× | Large tank holding feedwater, often U-shaped around the bunker. |
| 3 | Coal Bunker | 1× | Bunker holding coal (or an oil tank on oil-fired engines). |
| 4 | Tender Truck 3 parts | 2× | Two-axle bogie under the tender. |
| 5 | Coupler and Drawbar | 1× | Drawbar between locomotive and tender plus the rear knuckle coupler. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tender
5 top-level lines · 8 rows shown · 36 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tender Frame | steam-locomotive-tender-frame | 1× | 1 | · | part |
| 2 | Water Tank | steam-locomotive-water-tank | 1× | 1 | · | part |
| 3 | Coal Bunker | steam-locomotive-coal-bunker | 1× | 1 | · | part |
| 4 | Tender Truck 3 parts | steam-locomotive-tender-truck | 2× | 2 | 16 | assembly |
| 4.1 | Carrying Truck Wheel | steam-locomotive-truck-wheel | 4× | 8 | · | part |
| 4.2 | Coil Spring | coil-spring | 8× | 16 | · | part |
| 4.3 | Axle Bearing (Driving Box) | steam-locomotive-axle-bearing | 4× | 8 | · | part |
| 5 | Coupler and Drawbar | steam-locomotive-coupler | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the tender is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |