BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r169969 of this page, not the current version. Go to current · history

Top Loading System

Assembly

The dome fittings on top of the barrel: manway for inspection, fill connections, vapour return, and gauging. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Top Loading System

7 top-level lines as of r169969
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Manway tank-wagon-manway 1× 1 · part
2 Fill Valve tank-wagon-fill-valve 1× 1 · part
3 Vapour Return Valve tank-wagon-vapour-valve 1× 1 · part
4 Dip Tube tank-wagon-dip-tube 1× 1 · part
5 Dome Platform tank-wagon-dome-platform 1× 1 · part
6 O-Ring Set oring-set 2× 2 · part
7 Pressure Sensor pressure-sensor 1× 1 · part