Traction System
AssemblySelf-propelled mechanism advancing stabilizer along track at controlled speed during vibratory compaction. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Traction System parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Traction Motor | 1× | Hydraulic motor driving traction wheel |
| 2 | Traction Gearbox | 1× | Speed reduction gearbox 8:1 |
| 3 | Traction Wheel | 1× | Driven wheel engaging rail |
| 4 | Speed Control | 1× | Proportional speed regulation valve |
| 5 | Brake Unit | 1× | Spring-apply hydraulic brake |
| 6 | Encoder | 1× | Wheel rotation feedback sensor |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Traction System
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Traction Motor | track-stabilizer-traction-motor | 1× | 1 | · | part |
| 2 | Traction Gearbox | track-stabilizer-traction-gearbox | 1× | 1 | · | part |
| 3 | Traction Wheel | track-stabilizer-traction-wheel | 1× | 1 | · | part |
| 4 | Speed Control | track-stabilizer-speed-control | 1× | 1 | · | part |
| 5 | Brake Unit | track-stabilizer-brake | 1× | 1 | · | part |
| 6 | Encoder | encoder | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the traction system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |