BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Collation Infeed

Assembly

Gathers single-file products into rows and matrices ready to wrap. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Collation Infeed parts and their functions

5 top-level parts · 42 parts in total · full bill of materials below
Collation Infeed parts diagram: 1 infeed conveyor, 2 lane divider, 3 grouping gate, 4 pusher bar, 5 product sensor. 42 parts in 5 top-level items.
Collation Infeed parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Infeed Conveyor 1× Single-file feed
2 Lane Divider 2 parts 1× Split into lanes
3 Grouping Gate 2 parts 2× Meter product into groups
4 Pusher Bar 3 parts 1× Push group to wrap
5 Product Sensor 3× Detect product position

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Collation Infeed

5 top-level lines · 16 rows shown · 42 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Infeed Conveyor bundling-machine-film-infeed-conveyor 1× 1 · part
2 Lane Divider 2 parts bundling-machine-film-lane-divider 1× 1 5 assembly
2.1 Guide Rail bundling-machine-film-guide-rail 4× 4 · part
2.2 Fastener Set fastener-set 1× 1 · part
3 Grouping Gate 2 parts bundling-machine-film-grouping-gate 2× 2 3 assembly
3.1 Gate Cylinder bundling-machine-film-gate-cylinder 1× 2 · part
3.2 Gate Finger bundling-machine-film-gate-finger 2× 4 · part
4 Pusher Bar 3 parts bundling-machine-film-pusher-bar 1× 1 27 assembly
4.1 Pusher Paddle bundling-machine-film-pusher-paddle 1× 1 · part
4.2 Linear Guide Rail linear-guide 2× 2 · part
4.3 Servo Motor 4 parts servo-motor 1× 1 24 assembly
4.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
4.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
4.3.3 Encoder encoder 1× 1 · part
4.3.4 Motor Housing motor-housing 1× 1 · part
5 Product Sensor bundling-machine-film-product-sensor 3× 3 · part

Where the collation infeed is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks