BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Grip Mechanism

Assembly

The defining sub-system. A lever moved by the gripman closes a pair of hardened dies onto the moving cable; once clamped, the car is dragged at cable speed. Easing the lever opens the dies and the car coasts free of the cable. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Grip Mechanism parts and their functions

10 top-level parts · 40 parts in total · full bill of materials below
Grip Mechanism parts diagram: 1 grip lever, 2 grip quadrant, 3 grip jaw, 4 grip die, 5 grip take-up screw, 6 grip toggle link, 7 grip cam block, 8 grip return spring, 9 cable guide pulley, 10 fastener set. 40 parts in 10 top-level items.
Grip Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Grip Lever 1× Hand lever the gripman pulls
2 Grip Quadrant 3 parts 1× Toothed sector locking lever positions
3 Grip Jaw 3 parts 2× Movable upper and fixed lower jaw
4 Grip Die 6× Replaceable hardened wear inserts
5 Grip Take-up Screw 1× Take-up screw closing the jaws
6 Grip Toggle Link 2× Toggle linkage multiplying lever force
7 Grip Cam Block 1× Cam wedging the jaws shut
8 Grip Return Spring 1× Opens jaws when lever is eased
9 Cable Guide Pulley 3 parts 4× Steer the cable into the jaws
10 Fastener Set 1× Pins and keys

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Grip Mechanism

10 top-level lines · 19 rows shown · 40 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Grip Lever cable-car-streetcar-grip-lever 1× 1 · part
2 Grip Quadrant 3 parts cable-car-streetcar-grip-quadrant 1× 1 3 assembly
2.1 Quadrant Sector cable-car-streetcar-quadrant-sector 1× 1 · part
2.2 Quadrant Pawl cable-car-streetcar-quadrant-pawl 1× 1 · part
2.3 Coil Spring coil-spring 1× 1 · part
3 Grip Jaw 3 parts cable-car-streetcar-grip-jaw 2× 2 4 assembly
3.1 Jaw Body cable-car-streetcar-jaw-body 1× 2 · part
3.2 Grip Die cable-car-streetcar-grip-die 2× 4 · part
3.3 Fastener Set fastener-set 1× 2 · part
4 Grip Die cable-car-streetcar-grip-die 6× 6 · part
5 Grip Take-up Screw cable-car-streetcar-grip-screw 1× 1 · part
6 Grip Toggle Link cable-car-streetcar-grip-toggle-link 2× 2 · part
7 Grip Cam Block cable-car-streetcar-grip-cam-block 1× 1 · part
8 Grip Return Spring cable-car-streetcar-grip-return-spring 1× 1 · part
9 Cable Guide Pulley 3 parts cable-car-streetcar-cable-guide-pulley 4× 4 4 assembly
9.1 Pulley Sheave cable-car-streetcar-pulley-sheave 1× 4 · part
9.2 Ball Bearing ball-bearing 2× 8 · part
9.3 Pulley Axle cable-car-streetcar-pulley-axle 1× 4 · part
10 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the grip mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks