BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Landing Skid System

Assembly

Sacrificial skids and support rollers that take the vehicle weight when levitation is shut down in stations or after an emergency set-down. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Landing Skid System parts and their functions

5 top-level parts · 30 parts in total · full bill of materials below
Landing Skid System parts diagram: 1 landing skid, 2 skid carrier, 3 support roller, 4 ball bearing, 5 fastener set. 30 parts in 5 top-level items.
Landing Skid System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Landing Skid 8× Wear pads
2 Skid Carrier 8× Steel carrier that mounts the skid pad under the levitation frame.
3 Support Roller 4× Low-speed towing
4 Ball Bearing 8× Deep-groove radial ball bearing.
5 Fastener Set 2× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Landing Skid System

5 top-level lines · 5 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Landing Skid maglev-train-landing-skid 8× 8 · part
2 Skid Carrier maglev-train-skid-carrier 8× 8 · part
3 Support Roller maglev-train-support-roller 4× 4 · part
4 Ball Bearing ball-bearing 8× 8 · part
5 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the landing skid system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks