BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Weigh Hopper

Assembly

Individual hopper attached to load cell with discharge solenoid. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Weigh Hopper parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Weigh Hopper parts diagram: 1 hopper shell, 2 load cell, 3 discharge solenoid, 4 hopper gate. 6 parts in 4 top-level items.
Weigh Hopper parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hopper Shell 1× Conical vessel
2 Load Cell 2 parts 1× Weight sensor
3 Discharge Solenoid 2 parts 1× Gate release
4 Hopper Gate 1× Discharge valve

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Weigh Hopper

4 top-level lines · 8 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hopper Shell multihead-weigher-hopper-shell 1× 1 · part
2 Load Cell 2 parts multihead-weigher-load-cell 1× 1 2 assembly
2.1 Load Cell Transducer multihead-weigher-load-cell-transducer 1× 1 · part
2.2 Load Cell Connector multihead-weigher-load-cell-connector 1× 1 · part
3 Discharge Solenoid 2 parts multihead-weigher-discharge-solenoid 1× 1 2 assembly
3.1 Relay relay 1× 1 · part
3.2 Solenoid Coil multihead-weigher-solenoid-coil 1× 1 · part
4 Hopper Gate multihead-weigher-hopper-gate 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the weigh hopper is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks